본문으로 건너뛰기
전체 분석

섹터 · 반도체 · 2026년 7월 28일

Lab notebook: wet-bench bath #7과 아무도 log하지 않은 lifetime

Bath age, spike chemistry, changeout trigger가 particle·etch drift를 가른다—semiconductor wet-process notebook이지, UPW loop purity, CDA dew point, photoresist track logistics 아님.

Lab notebook: wet-bench bath #7과 아무도 log하지 않은 lifetime

Notebook: Wet Process · Bench 3 · Bath #7 (SC-1 sibling chemistry, 익명)
이 책의 규칙: ink only; “MES는 나중에 update” 금지


2026-07-12 — Install / fill

New bath target mix. TOC·particle baseline 기록. Operator: J.K.
Note: heater PID tuned; recirculation filter DP = 0.4 bar.


2026-07-18 — “Still fine”

Visual OK. Titration 없음. Production이 changeout “weekend까지” defer 요청.
Margin note (supervisor): weekend는 chemical property 아님.


2026-07-21 — First whisper

Metrology: 이 bench만 exit wafer에서 slight particle uptick. Split lot bench-correlated 확인.
Action taken: none. Action discussed: “monitor.”


2026-07-23 — Titration (finally)

Active species target 대비 low. Stabilizer odd. Filter DP 1.1 bar.
Bath age: soft SOP max 7 “or by titration” 대비 11 days.

Recirculation filter·sample port 있는 wet bench bath tank

Titration이 optional이면 lifetime은 folklore.


2026-07-23 — Changeout

Drain / rinse / refill. Filter replaced. Baseline two lot 내 복구.
Scrap은 이미 3일 “unknown fab particles”로 booked.


2026-07-25 — 이 책에서 rule rewrite (slide 아님)

Changeout trigger (하나만 firing):

  1. Calendar max hours (hard)
  2. Titration window 밖 (hard)
  3. Filter DP limit (hard)
  4. Bench-correlated particle signature (hard)
  5. Production preference (never)

Adjacent page에서 붙인 cross-check

| Signal | Bath #7 | Bath #6 (control) | | --- | --- | --- | | Particle delta | + | flat | | Titration | late | on schedule | | Filter DP | high | nominal | | Ownership | shared shrug | named wet owner |


Adjacent fences

UPW는 facility water purity. CDA는 dry air. Photoresist track은 coat/develop. AMC hunt는 airborne organics. 아무도 Bench 3 bath titration cadence 소유 아님. Titration refuse한 bath에 UPW blame 금지.

Dated log sheet 옆 wet bench·titration cart

Notebook은 MES가 same gate enforce할 때까지 control system.


Last line (2026-07-28)

Bath #7 reminder: wet lifetime은 measured, negotiated 아님. Book에 time 없으면 happened 아님.

같은 섹터의 다른 분석